Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
start:1-france:b-redesigning:architecture [2014/09/24 19:03]
antony
start:1-france:b-redesigning:architecture [2014/12/29 20:14] (current)
antony
Line 6: Line 6:
   * [[start:​5-working together|Together]]   * [[start:​5-working together|Together]]
   * [[start:​6-multimedia glossaries|Glossaries]]   * [[start:​6-multimedia glossaries|Glossaries]]
 +  * [[start:​7-pictionary|Pictionary]]
 </​WRAP>​ </​WRAP>​
-====== Architecture and Town planning in La Verpillière ====== 
  
-{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}}+====== Town planning: redesigning the sector around the station of La Verpillière ====== 
 + 
 +{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}} <WRAP JUSTIFY>​After having met with the town's mayor and elected representatives responsible for urban planning and economic development,​ students were left with a number of parameters to bear in mind. And students were also given a time frame to come up with a solution for the redevelopment of the sector around the station that they would need to present to La Verpillière Town Council in May 2015.</​WRAP>  ​
  
 <WRAP center round box 3.5%> <WRAP center round box 3.5%>
Line 15: Line 17:
 </​WRAP>​ </​WRAP>​
  
-====== ​Besoins et contraintes liés au réaménagement de la gare de La Verpillière ======+====== ​Needs and constraints linked to redeveloping the station of La Verpillière ======
  
  
-===== Besoins-enjeux : =====+===== Needs and issues at stake=====
  
-Suppression du passage à niveau+  - Getting rid of the level crossing
-déviation de la route départementale 126+  - re-routing traffic from the D126 road to avoid unnecessary traffic congestion
-déplacement de la gare+  - developing the station for the projected increase in passenger traffic
-aménagement ​de la circulation sur l'​avenue de la gare+  - re-working the traffic flows along the Avenue ​de la Gare
-déplacement du parking des cars scolaires des Maristes+  - re-siting the Sainte-Marie Lyon school bus terminus
-agrandissement du parking ​de la gare+  - extending station car parking, but to what level?
-améliorer la sécurité autour de la gare à cause de la circulation+  - improving safety around the station through reduced traffic flow
-améliorer l'​accès à la gare ainsi que la traversée des voies+  - improving station access, as well as making crossing to the opposite platform easier
-mise en place de nouveaux parkings+  - extending other sorts of parking (such as for bicycles and electric cars)
-améliorer l’accessibilité aux personnes handicapées+  - favouring soft transport methods, especially between the station and the new outlet village
-création de nouveaux stationnements de bus, +  - improving disabled access to and inside the station, 
-fluidifier le trafic.+  - creating a new bus terminus for public transport to and from the station, 
 +  - adding new services and/or shops for commuters
 +  - easing traffic flow.
  
-===== Contraintes-invariants : =====+===== Constraints-invariables ​=====
  
-ne pas affaiblir la liaison entre la Verpillière ​et Villefontaine, +  * All the stakeholders need to be in agreement. 
-ne pas déplacer les Maristes, +  * Making sure the La Verpillière-Villefontaine ​link road is maintained. 
-savoir si on déplace le gymnase, +  * Sainte-Marie Lyon school cannot be re-sited. 
-ne pas déplacer les habitations+  * The school gymnasium and other parts of the school are not open to the general public. 
-mobiliser les acteurs, +  * Construction of a new outlet village is due to begin in early 2015bringing increased traffic. ​ 
-impossibilité de délocaliser les entreprises,​ +  * The new housing development cannot be re-sited. 
-site assez réduit.+  * Local businesses cannot be relocated. 
 +  * There is a habitat corridor for wildlife that cannot be built on. 
 +  * The site is relatively small and building potential limited.
  
 ====== Presentation by the French Town Hall  ====== ====== Presentation by the French Town Hall  ======
  
 +{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_1-_sept_2014.jpg?​800|}}
 +
 +{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​800|}}
 +
 +{{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}}
 +
 +{{maplink:​Gare LA VERPILLIERE:​Google Maps - Site of La Verpillière'​s Station}}
 +
 +===== Players =====
 +
 +
 +==== State ====
 +  * Reginal and local authorities, ​
 +  * La Verpillière Town Hall, 
 +  * Villefontaine Town Hall, 
 +  * North Isère Urban Authority (Communauté d’agglomération des Portes de l’Isère or "​CAPI"​),​
 +  * Isère Council,
 +  * Rhone-Alps Regional Council,
 +  * The French rail network provider: RFF.
 +
 +==== Main private players ====
 +  * The school Sainte-Marie Lyon,
 +  * A company called Nemera.
 +
 +===== Various solutions proposed and studied =====
 +
 +  * Getting rid of the level crossing. ​
 +  * Re-routing the local road 1006 which goes over the level crossing. ​
 +  * Creating an intermodal hub.
 +  * Resiting of or safety improvement work on the Marist school bus park. 
 +  * Rethinking of the direction of traffic along Avenue Général de Gaulle and Avenue Général Giraud.
 +  * Development of the Léman site.
 +  * No resiting of the current La Verpillière station due to costs and political considerations.
 +
 +
 +
 +<WRAP center round box 3.5%>
 +[[start:​1-france:​b-redesigning|Back]]
 +</​WRAP>​
  
  
  
start/1-france/b-redesigning/architecture.1411578208.txt.gz · Last modified: 2014/09/24 19:03 (external edit)