start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
start:1-france:b-redesigning:architecture [2013/12/08 12:21]
antony
start:1-france:b-redesigning:architecture [2014/12/29 20:14] (current)
antony
Line 6: Line 6:
   * [[start:​5-working together|Together]]   * [[start:​5-working together|Together]]
   * [[start:​6-multimedia glossaries|Glossaries]]   * [[start:​6-multimedia glossaries|Glossaries]]
 +  * [[start:​7-pictionary|Pictionary]]
 </​WRAP>​ </​WRAP>​
-====== Architecture and Town planning in La Verpillière ====== 
  
-{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}}This is my super text... Thank you Mr Lafay for correcting it!!! 8-)+====== Town planning: redesigning the sector around the station of La Verpillière ====== 
 + 
 +{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}} <WRAP JUSTIFY>​After having met with the town's mayor and elected representatives responsible for urban planning and economic development,​ students were left with a number of parameters to bear in mindAnd students were also given a time frame to come up with a solution for the redevelopment of the sector around the station that they would need to present to La Verpillière Town Council in May 2015.</​WRAP>  ​
  
 <WRAP center round box 3.5%> <WRAP center round box 3.5%>
 [[start:​1-france:​b-redesigning|Back]] [[start:​1-france:​b-redesigning|Back]]
 </​WRAP>​ </​WRAP>​
 +
 +====== Needs and constraints linked to redeveloping the station of La Verpillière ======
 +
 +
 +===== Needs and issues at stake=====
 +
 +  - Getting rid of the level crossing,
 +  - re-routing traffic from the D126 road to avoid unnecessary traffic congestion,
 +  - developing the station for the projected increase in passenger traffic,
 +  - re-working the traffic flows along the Avenue de la Gare,
 +  - re-siting the Sainte-Marie Lyon school bus terminus,
 +  - extending station car parking, but to what level?,
 +  - improving safety around the station through reduced traffic flow,
 +  - improving station access, as well as making crossing to the opposite platform easier,
 +  - extending other sorts of parking (such as for bicycles and electric cars),
 +  - favouring soft transport methods, especially between the station and the new outlet village,
 +  - improving disabled access to and inside the station,
 +  - creating a new bus terminus for public transport to and from the station,
 +  - adding new services and/or shops for commuters,
 +  - easing traffic flow.
 +
 +===== Constraints-invariables =====
 +
 +  * All the stakeholders need to be in agreement.
 +  * Making sure the La Verpillière-Villefontaine link road is maintained.
 +  * Sainte-Marie Lyon school cannot be re-sited.
 +  * The school gymnasium and other parts of the school are not open to the general public.
 +  * Construction of a new outlet village is due to begin in early 2015, bringing increased traffic. ​
 +  * The new housing development cannot be re-sited.
 +  * Local businesses cannot be relocated.
 +  * There is a habitat corridor for wildlife that cannot be built on.
 +  * The site is relatively small and building potential limited.
 +
 +====== Presentation by the French Town Hall  ======
 +
 +{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_1-_sept_2014.jpg?​800|}}
 +
 +{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​800|}}
 +
 +{{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}}
 +
 +{{maplink:​Gare LA VERPILLIERE:​Google Maps - Site of La Verpillière'​s Station}}
 +
 +===== Players =====
 +
 +
 +==== State ====
 +  * Reginal and local authorities, ​
 +  * La Verpillière Town Hall, 
 +  * Villefontaine Town Hall, 
 +  * North Isère Urban Authority (Communauté d’agglomération des Portes de l’Isère or "​CAPI"​),​
 +  * Isère Council,
 +  * Rhone-Alps Regional Council,
 +  * The French rail network provider: RFF.
 +
 +==== Main private players ====
 +  * The school Sainte-Marie Lyon,
 +  * A company called Nemera.
 +
 +===== Various solutions proposed and studied =====
 +
 +  * Getting rid of the level crossing. ​
 +  * Re-routing the local road 1006 which goes over the level crossing. ​
 +  * Creating an intermodal hub.
 +  * Resiting of or safety improvement work on the Marist school bus park. 
 +  * Rethinking of the direction of traffic along Avenue Général de Gaulle and Avenue Général Giraud.
 +  * Development of the Léman site.
 +  * No resiting of the current La Verpillière station due to costs and political considerations.
 +
 +
 +
 +<WRAP center round box 3.5%>
 +[[start:​1-france:​b-redesigning|Back]]
 +</​WRAP>​
 +
 +
 +