Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
start:1-france:b-redesigning:architecture [2014/10/02 16:47]
antony
start:1-france:b-redesigning:architecture [2014/10/18 18:20]
antony
Line 57: Line 57:
 {{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}} {{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}}
  
-===== Acteurs =====+{{maplink:​Gare LA VERPILLIERE:​Google Maps - Site of La Verpillière'​s Station}}
  
 +===== Players =====
  
-==== Etat ==== 
-  * Collectivité territoriale ou assimilée 
-  * Mairie de La Verpillière, ​ 
-  * Mairie de Villefontaine, ​ 
-  * Communauté d’agglomération des Portes de l’Isère (CAPI) 
-  * Conseil général, 
-  * Conseil régional, 
-  * RFF. 
  
-==== Principaux acteurs Privés ​==== +==== State ==== 
-  * Sainte-Marie Lyon +  * Reginal and local authorities,​  
-  * Nemera+  * La Verpillière Town Hall,  
 +  * Villefontaine Town Hall,  
 +  * North Isère Urban Authority (Communauté d’agglomération des Portes de l’Isère or "​CAPI"​),​ 
 +  * Isère Council, 
 +  * Rhone-Alps Regional Council, 
 +  * The French rail network provider: RFF.
  
-===== Projets ou réflexions recensés =====+==== Main private players ​==== 
 +  * The school Sainte-Marie Lyon, 
 +  * A company called Nemera.
  
-  ​Suppression du passage à niveau +===== Various solutions proposed and studied ===== 
-  * Déviation de la RD 1006 (franchissement) en lien avec le point précédent + 
-  * Création d’un pôle multimodal +  ​Getting rid of the level crossing. ​ 
-  * Déplacement ou mise en sécurité du pôle cars scolaires des Maristes +  * Re-routing the local road 1006 which goes over the level crossing. ​ 
-  * Réflexion sur les sens de circulations de l’Avenue Général de Gaulle ​et l’Avenue Général Giraud +  * Creating an intermodal hub. 
-  * Développement de la zone du Léman +  * Resiting of or safety improvement work on the Marist school bus park.  
-  * Pas de déplacement de la gare+  * Rethinking of the direction of traffic along Avenue Général de Gaulle ​and Avenue Général Giraud. 
 +  * Development of the Léman ​site. 
 +  * No resiting of the current La Verpillière station due to costs and political considerations.
  
  
start/1-france/b-redesigning/architecture.txt · Last modified: 2014/12/29 20:14 by antony