This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
start:1-france:b-redesigning:architecture [2014/09/24 21:19] antony |
start:1-france:b-redesigning:architecture [2014/10/18 18:20] antony |
||
---|---|---|---|
Line 6: | Line 6: | ||
* [[start:5-working together|Together]] | * [[start:5-working together|Together]] | ||
* [[start:6-multimedia glossaries|Glossaries]] | * [[start:6-multimedia glossaries|Glossaries]] | ||
+ | * [[start:7-pictionary|Pictionary]] | ||
</WRAP> | </WRAP> | ||
- | ====== Town planning: the sector to redevelop around the station of La Verpillière ====== | ||
- | {{:start:1-france:b-redesigning:architecture:architecture.jpg?200 |}} | + | ====== Town planning: redesigning the sector around the station of La Verpillière ====== |
+ | |||
+ | {{:start:1-france:b-redesigning:architecture:architecture.jpg?200 |}} <WRAP JUSTIFY>After having met with the town's mayor and elected representatives responsible for urban planning and economic development, students were left with a number of parameters to bear in mind. And students were also given a time frame to come up with a solution for the redevelopment of the sector around the station that they would need to present to La Verpillière Town Council in May 2015.</WRAP> | ||
<WRAP center round box 3.5%> | <WRAP center round box 3.5%> | ||
Line 55: | Line 57: | ||
{{:start:1-france:b-redesigning:aerial_view.jpg?460 |}}{{ :start:1-france:b-redesigning:aerial_view_2.jpg?490|}} | {{:start:1-france:b-redesigning:aerial_view.jpg?460 |}}{{ :start:1-france:b-redesigning:aerial_view_2.jpg?490|}} | ||
- | ===== Acteurs ===== | + | {{maplink:Gare LA VERPILLIERE:Google Maps - Site of La Verpillière's Station}} |
+ | |||
+ | ===== Players ===== | ||
- | ==== Etat ==== | + | ==== State ==== |
- | * Collectivité territoriale ou assimilée | + | * Reginal and local authorities, |
- | * Mairie de La Verpillière, | + | * La Verpillière Town Hall, |
- | * Mairie de Villefontaine, | + | * Villefontaine Town Hall, |
- | * Communauté d’agglomération des Portes de l’Isère (CAPI) | + | * North Isère Urban Authority (Communauté d’agglomération des Portes de l’Isère or "CAPI"), |
- | * Conseil général, | + | * Isère Council, |
- | * Conseil régional, | + | * Rhone-Alps Regional Council, |
- | * RFF. | + | * The French rail network provider: RFF. |
- | ==== Principaux acteurs Privés ==== | + | ==== Main private players ==== |
- | * Sainte-Marie Lyon | + | * The school Sainte-Marie Lyon, |
- | * Nemera | + | * A company called Nemera. |
- | ===== Projets ou réflexions recensés ===== | + | ===== Various solutions proposed and studied ===== |
- | * Suppression du passage à niveau | + | * Getting rid of the level crossing. |
- | * Déviation de la RD 1006 (franchissement) en lien avec le point précédent | + | * Re-routing the local road 1006 which goes over the level crossing. |
- | * Création d’un pôle multimodal | + | * Creating an intermodal hub. |
- | * Déplacement ou mise en sécurité du pôle cars scolaires des Maristes | + | * Resiting of or safety improvement work on the Marist school bus park. |
- | * Réflexion sur les sens de circulations de l’Avenue Général de Gaulle et l’Avenue Général Giraud | + | * Rethinking of the direction of traffic along Avenue Général de Gaulle and Avenue Général Giraud. |
- | * Développement de la zone du Léman | + | * Development of the Léman site. |
- | * Pas de déplacement de la gare | + | * No resiting of the current La Verpillière station due to costs and political considerations. |