Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
start:1-france:b-redesigning:architecture [2014/09/24 20:37]
antony [Presentation by the French Town Hall]
start:1-france:b-redesigning:architecture [2014/10/18 18:20]
antony
Line 6: Line 6:
   * [[start:​5-working together|Together]]   * [[start:​5-working together|Together]]
   * [[start:​6-multimedia glossaries|Glossaries]]   * [[start:​6-multimedia glossaries|Glossaries]]
 +  * [[start:​7-pictionary|Pictionary]]
 </​WRAP>​ </​WRAP>​
-====== Architecture and Town planning in La Verpillière ====== 
  
-{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}}+====== Town planning: redesigning the sector around the station of La Verpillière ====== 
 + 
 +{{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}} <WRAP JUSTIFY>​After having met with the town's mayor and elected representatives responsible for urban planning and economic development,​ students were left with a number of parameters to bear in mind. And students were also given a time frame to come up with a solution for the redevelopment of the sector around the station that they would need to present to La Verpillière Town Council in May 2015.</​WRAP>  ​
  
 <WRAP center round box 3.5%> <WRAP center round box 3.5%>
Line 15: Line 17:
 </​WRAP>​ </​WRAP>​
  
-====== ​Besoins et contraintes liés au réaménagement de la gare de La Verpillière ======+====== ​Needs and constraints linked to redeveloping the station of La Verpillière ======
  
  
-===== Besoins-enjeux : =====+===== Needs and issues at stake=====
  
-Suppression du passage à niveau+  - Getting rid of the level crossing
-déviation de la route départementale 126+  - re-routing traffic from the D126 road to avoid unnecessary traffic congestion
-déplacement de la gare+  - developing the station for the projected increase in passenger traffic
-aménagement ​de la circulation sur l'​avenue de la gare+  - re-working the traffic flows along the Avenue ​de la Gare
-déplacement du parking des cars scolaires des Maristes+  - re-siting the Sainte-Marie Lyon school bus terminus
-agrandissement du parking ​de la gare+  - extending station car parking, but to what level?
-améliorer la sécurité autour de la gare à cause de la circulation+  - improving safety around the station through reduced traffic flow
-améliorer l'​accès à la gare ainsi que la traversée des voies+  - improving station access, as well as making crossing to the opposite platform easier
-mise en place de nouveaux parkings+  - extending other sorts of parking (such as for bicycles and electric cars)
-améliorer l’accessibilité aux personnes handicapées+  - favouring soft transport methods, especially between the station and the new outlet village
-création de nouveaux stationnements de bus, +  - improving disabled access to and inside the station, 
-fluidifier le trafic.+  - creating a new bus terminus for public transport to and from the station, 
 +  - adding new services and/or shops for commuters
 +  - easing traffic flow.
  
-===== Contraintes-invariants : =====+===== Constraints-invariables ​=====
  
-ne pas affaiblir la liaison entre la Verpillière ​et Villefontaine, +  * All the stakeholders need to be in agreement. 
-ne pas déplacer les Maristes, +  * Making sure the La Verpillière-Villefontaine ​link road is maintained. 
-savoir si on déplace le gymnase, +  * Sainte-Marie Lyon school cannot be re-sited. 
-ne pas déplacer les habitations+  * The school gymnasium and other parts of the school are not open to the general public. 
-mobiliser les acteurs, +  * Construction of a new outlet village is due to begin in early 2015bringing increased traffic. ​ 
-impossibilité de délocaliser les entreprises,​ +  * The new housing development cannot be re-sited. 
-site assez réduit.+  * Local businesses cannot be relocated. 
 +  * There is a habitat corridor for wildlife that cannot be built on. 
 +  * The site is relatively small and building potential limited.
  
 ====== Presentation by the French Town Hall  ====== ====== Presentation by the French Town Hall  ======
  
-{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_1-_sept_2014.jpg?​300|}}+{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_1-_sept_2014.jpg?​800|}} 
 + 
 +{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​800|}} 
 + 
 +{{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}} 
 + 
 +{{maplink:​Gare LA VERPILLIERE:​Google Maps - Site of La Verpillière'​s Station}} 
 + 
 +===== Players ===== 
 + 
 + 
 +==== State ==== 
 +  * Reginal and local authorities,​  
 +  * La Verpillière Town Hall,  
 +  * Villefontaine Town Hall,  
 +  * North Isère Urban Authority (Communauté d’agglomération des Portes de l’Isère or "​CAPI"​),​ 
 +  * Isère Council, 
 +  * Rhone-Alps Regional Council, 
 +  * The French rail network provider: RFF. 
 + 
 +==== Main private players ==== 
 +  * The school Sainte-Marie Lyon, 
 +  * A company called Nemera.
  
-{{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​300|}}+===== Various solutions proposed and studied =====
  
-{{:start:1-france:​b-redesigning:​aerial_view.jpg?300|}}+  * Getting rid of the level crossing.  
 +  * Re-routing the local road 1006 which goes over the level crossing.  
 +  * Creating an intermodal hub. 
 +  * Resiting of or safety improvement work on the Marist school bus park.  
 +  * Rethinking of the direction of traffic along Avenue Général de Gaulle and Avenue Général Giraud. 
 +  * Development of the Léman site. 
 +  * No resiting of the current La Verpillière station due to costs and political considerations.
  
-{{:​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​300|}} 
  
  
  
  
start/1-france/b-redesigning/architecture.txt · Last modified: 2014/12/29 20:14 by antony