Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
start:1-france:b-redesigning [2014/10/15 19:27]
sml_students
start:1-france:b-redesigning [2014/12/30 19:39]
antony
Line 19: Line 19:
 [[start:​1-france:​b-redesigning:​architecture|Town planning: redesigning the sector of La Verpillière station]] [[start:​1-france:​b-redesigning:​architecture|Town planning: redesigning the sector of La Verpillière station]]
  
-[[start:​1-france:​b-redesigning:​Drawing|Draw the new railway station]]+[[start:​1-france:​b-redesigning:​drawing|Drawing ​the new railway station]]
  
 [[start:​1-france:​b-redesigning:​other-stations|Comparisons with other railway stations]] [[start:​1-france:​b-redesigning:​other-stations|Comparisons with other railway stations]]
Line 33: Line 33:
 [[start:​1-france:​b-redesigning:​local|Local issues in La Verpillière and Villefontaine]] [[start:​1-france:​b-redesigning:​local|Local issues in La Verpillière and Villefontaine]]
  
-[[start:​1-france:​b-redesigning:​solution1|Solution ​1Getting rid of the level crossing]]+[[start:​1-france:​b-redesigning:​solution|Our Solution: ​Making ​the Station an intermodal hub]]
  
-[[start:​1-france:​b-redesigning:​solution2|Solution 2: Keeping ​the level crossing]]</​columns>​+[[start:​1-france:​b-redesigning:​solution2|Solution 2: Redeveloping just the station and its plaza]]</​columns>​
  
 ---- ----
start/1-france/b-redesigning.txt · Last modified: 2014/12/30 19:41 by antony