Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:a-research:02-station:idea1

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Last revision Both sides next revision
start:1-france:a-research:02-station:idea1 [2014/05/21 22:13]
sml_students
start:1-france:a-research:02-station:idea1 [2014/05/21 23:36]
antony
Line 12: Line 12:
 [[start:​1-france:​a-research:​02-station|Back]] [[start:​1-france:​a-research:​02-station|Back]]
 </​WRAP>​ </​WRAP>​
-Pour les aménageursla suppression du passage à niveau est nécessairePour permettre la desserte des voiesun passage inférieur doit être construitIl sera pratiqué par les transports en commun et les piétonsL'​aménagement de nouveaux arrêts de bus et d'​un ​parking ​est souhaitable côté nord. +For developersthe removal of the level crossing is a mustTo maintain access to and from the stationan underpass would have to be constructedIt would be used by both public transport and pedestriansThe development of new bus stops and parking ​would be desirable on the north sideTo address the use of alternative ​modes of transporta bicycle park (which already existswould be expandedIn order to limit the impact ​of the development on the landscapea leafy esplanade ​is plannedAs for the schoola north-south expressway would be built alongside the current "​Alps"​ car park.
-Pour répondre à l'​usage des modes douxun parking à vélo (déjà existantsera agrandi. +
-Dans un souci de limiter l'impact ​de l'​aménagement dans le paysageune esplanade ​arborée est prévue. +
-Concernant l'​écoleune voie rapide NS serait aménagée le long du parking des Alpes.+
  
-Cependant, il y a certaines contraintes : +However, there are some drawbacks
- +  ​* ​The expressway would be a safety issue for the children of the school. In addition, its development ​would be costly because it would mean expropriations. 
-La voie rapide pose un problème de sécurité pour les enfants de l'​école. De plus, son aménagement est onéreux car il préconise des expropriations. +  ​* ​The station ​which is considered unsuited to the current traffic will soon be permanently ​exceed its limits. A new building would still need to be built.
- +
-La gare, considérée comme inadaptée au trafic actuel, sera irrémédiablement dépassé. Un nouveau local resterait à construire. +
- +
-For developers, the removal of the crossing is needed. To allow the service channels, a lower passage to be constructed. +
-It is practiced by public transport and pedestrians. The development of new bus stops and parking is desirable north side. +
-To address the use of alternative modes, a bicycle parking (existing) will be expanded. +
-In order to limit the impact of the development on the landscape, a leafy plaza is planned. +
-About school, NS expressway would be built along the car park of the Alps. +
- +
-However, there are some constraints+
- +
-The fast lane is a safety issue for the children of the school. In addition, its development ​is costly because it calls for expropriations. +
- +
-The station considered unsuited to the current traffic will be permanently ​exceeded. A new building would remain local.+
  
  
start/1-france/a-research/02-station/idea1.txt · Last modified: 2014/10/02 16:41 by antony