This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
start:1-france:b-redesigning:architecture [2014/09/24 21:04] antony |
start:1-france:b-redesigning:architecture [2014/10/15 22:14] antony |
||
---|---|---|---|
Line 6: | Line 6: | ||
* [[start:5-working together|Together]] | * [[start:5-working together|Together]] | ||
* [[start:6-multimedia glossaries|Glossaries]] | * [[start:6-multimedia glossaries|Glossaries]] | ||
+ | * [[start:7-pictionary|Pictionary]] | ||
</WRAP> | </WRAP> | ||
- | ====== Town planning: the sector to redevelop around the station of La Verpillière ====== | ||
- | {{:start:1-france:b-redesigning:architecture:architecture.jpg?200 |}} | + | ====== Town planning: redesigning the sector around the station of La Verpillière ====== |
+ | |||
+ | {{:start:1-france:b-redesigning:architecture:architecture.jpg?200 |}} <WRAP JUSTIFY>After having met with the town's mayor and elected representatives responsible for urban planning and economic development, students were left with a number of parameters to bear in mind. And students were also given a time frame to come up with a solution for the redevelopment of the sector around the station that they would need to present to La Verpillière Town Council in May 2015.</WRAP> | ||
<WRAP center round box 3.5%> | <WRAP center round box 3.5%> | ||
Line 18: | Line 20: | ||
- | ===== Needs and stakes===== | + | ===== Needs and issues at stake===== |
- Getting rid of the level crossing, | - Getting rid of the level crossing, | ||
- | - re-routing the D126 road, | + | - re-routing traffic from the D126 road to avoid unnecessary traffic congestion, |
- | - re-siting the station, | + | - developing the station for the projected increase in passenger traffic, |
- re-working the traffic flows along the Avenue de la Gare, | - re-working the traffic flows along the Avenue de la Gare, | ||
- re-siting the Sainte-Marie Lyon school bus terminus, | - re-siting the Sainte-Marie Lyon school bus terminus, | ||
- | - extending station car parking, | + | - extending station car parking, but to what level?, |
- improving safety around the station through reduced traffic flow, | - improving safety around the station through reduced traffic flow, | ||
- improving station access, as well as making crossing to the opposite platform easier, | - improving station access, as well as making crossing to the opposite platform easier, | ||
- extending other sorts of parking (such as for bicycles and electric cars), | - extending other sorts of parking (such as for bicycles and electric cars), | ||
- | - improving disabled access, | + | - favouring soft transport methods, especially between the station and the new outlet village, |
- | - creating a new bus terminus, | + | - improving disabled access to and inside the station, |
+ | - creating a new bus terminus for public transport to and from the station, | ||
+ | - adding new services and/or shops for commuters, | ||
- easing traffic flow. | - easing traffic flow. | ||
Line 52: | Line 56: | ||
{{:start:1-france:b-redesigning:aerial_view.jpg?460 |}}{{ :start:1-france:b-redesigning:aerial_view_2.jpg?490|}} | {{:start:1-france:b-redesigning:aerial_view.jpg?460 |}}{{ :start:1-france:b-redesigning:aerial_view_2.jpg?490|}} | ||
+ | |||
+ | {{maplink:Gare LA VERPILLIERE:Google Maps - Site of La Verpillière's Station}} | ||
+ | |||
+ | ===== Acteurs ===== | ||
+ | |||
+ | |||
+ | ==== Etat ==== | ||
+ | * Collectivité territoriale ou assimilée | ||
+ | * Mairie de La Verpillière, | ||
+ | * Mairie de Villefontaine, | ||
+ | * Communauté d’agglomération des Portes de l’Isère (CAPI) | ||
+ | * Conseil général, | ||
+ | * Conseil régional, | ||
+ | * RFF. | ||
+ | |||
+ | ==== Principaux acteurs Privés ==== | ||
+ | * Sainte-Marie Lyon | ||
+ | * Nemera | ||
+ | |||
+ | ===== Projets ou réflexions recensés ===== | ||
+ | |||
+ | * Suppression du passage à niveau | ||
+ | * Déviation de la RD 1006 (franchissement) en lien avec le point précédent | ||
+ | * Création d’un pôle multimodal | ||
+ | * Déplacement ou mise en sécurité du pôle cars scolaires des Maristes | ||
+ | * Réflexion sur les sens de circulations de l’Avenue Général de Gaulle et l’Avenue Général Giraud | ||
+ | * Développement de la zone du Léman | ||
+ | * Pas de déplacement de la gare | ||