Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start:1-france:b-redesigning:architecture [2014/09/24 21:04]
antony
start:1-france:b-redesigning:architecture [2014/09/24 21:19]
antony
Line 18: Line 18:
  
  
-===== Needs and stakes=====+===== Needs and issues at stake=====
  
   - Getting rid of the level crossing,   - Getting rid of the level crossing,
-  - re-routing the D126 road, +  - re-routing ​traffic from the D126 road to avoid unnecessary traffic congestion
-  - re-siting ​the station,+  - developing ​the station ​for the projected increase in passenger traffic,
   - re-working the traffic flows along the Avenue de la Gare,   - re-working the traffic flows along the Avenue de la Gare,
   - re-siting the Sainte-Marie Lyon school bus terminus,   - re-siting the Sainte-Marie Lyon school bus terminus,
-  - extending station car parking,+  - extending station car parking, but to what level?,
   - improving safety around the station through reduced traffic flow,   - improving safety around the station through reduced traffic flow,
   - improving station access, as well as making crossing to the opposite platform easier,   - improving station access, as well as making crossing to the opposite platform easier,
   - extending other sorts of parking (such as for bicycles and electric cars),   - extending other sorts of parking (such as for bicycles and electric cars),
-  - improving disabled access, +  ​- favouring soft transport methods, especially between the station and the new outlet village, 
-  - creating a new bus terminus,+  ​- improving disabled access ​to and inside the station
 +  - creating a new bus terminus ​for public transport to and from the station, 
 +  - adding new services and/or shops for commuters,
   - easing traffic flow.   - easing traffic flow.
  
Line 52: Line 54:
  
 {{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}} {{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}}
 +
 +===== Acteurs =====
 +
 +
 +==== Etat ====
 +  * Collectivité territoriale ou assimilée
 +  * Mairie de La Verpillière, ​
 +  * Mairie de Villefontaine, ​
 +  * Communauté d’agglomération des Portes de l’Isère (CAPI)
 +  * Conseil général,
 +  * Conseil régional,
 +  * RFF.
 +
 +==== Principaux acteurs Privés ====
 +  * Sainte-Marie Lyon
 +  * Nemera
 +
 +===== Projets ou réflexions recensés =====
 +
 +  * Suppression du passage à niveau
 +  * Déviation de la RD 1006 (franchissement) en lien avec le point précédent
 +  * Création d’un pôle multimodal
 +  * Déplacement ou mise en sécurité du pôle cars scolaires des Maristes
 +  * Réflexion sur les sens de circulations de l’Avenue Général de Gaulle et l’Avenue Général Giraud
 +  * Développement de la zone du Léman
 +  * Pas de déplacement de la gare
  
  
start/1-france/b-redesigning/architecture.txt · Last modified: 2014/12/29 20:14 by antony