Redesign Your Town

Urban Regeneration in Four European Countries

User Tools

Site Tools


start:1-france:b-redesigning:architecture

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
start:1-france:b-redesigning:architecture [2014/09/24 20:39]
antony [Presentation by the French Town Hall]
start:1-france:b-redesigning:architecture [2014/09/24 21:06]
antony
Line 7: Line 7:
   * [[start:​6-multimedia glossaries|Glossaries]]   * [[start:​6-multimedia glossaries|Glossaries]]
 </​WRAP>​ </​WRAP>​
-====== ​Architecture and Town planning ​in La Verpillière ======+====== Town planning: the sector to redevelop around the station of La Verpillière ======
  
 {{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}} {{:​start:​1-france:​b-redesigning:​architecture:​architecture.jpg?​200 |}}
Line 15: Line 15:
 </​WRAP>​ </​WRAP>​
  
-====== ​Besoins et contraintes liés au réaménagement de la gare de La Verpillière ======+====== ​Needs and constraints linked to redeveloping the station of La Verpillière ======
  
  
-===== Besoins-enjeux : =====+===== Needs and issues at stake=====
  
-Suppression du passage à niveau+  - Getting rid of the level crossing
-déviation de la route départementale 126+  - re-routing the D126 road
-déplacement de la gare+  - developing the station for the projected increase in passenger traffic
-aménagement ​de la circulation sur l'​avenue de la gare+  - re-working the traffic flows along the Avenue ​de la Gare
-déplacement du parking des cars scolaires des Maristes+  - re-siting the Sainte-Marie Lyon school bus terminus
-agrandissement du parking ​de la gare+  - extending station car parking, 
-améliorer la sécurité autour de la gare à cause de la circulation+  - improving safety around the station through reduced traffic flow
-améliorer l'​accès à la gare ainsi que la traversée des voies+  - improving station access, as well as making crossing to the opposite platform easier
-mise en place de nouveaux parkings+  - extending other sorts of parking (such as for bicycles and electric cars)
-améliorer l’accessibilité aux personnes handicapées+  - improving disabled access
-création de nouveaux stationnements de bus, +  - creating a new bus terminus
-fluidifier le trafic.+  - easing traffic flow.
  
-===== Contraintes-invariants : =====+===== Constraints-invariables ​=====
  
-ne pas affaiblir la liaison entre la Verpillière ​et Villefontaine, +  * All the stakeholders need to be in agreement. 
-ne pas déplacer les Maristes, +  * Making sure the La Verpillière-Villefontaine ​link road is maintained. 
-savoir si on déplace le gymnase, +  * Sainte-Marie Lyon school cannot be re-sited. 
-ne pas déplacer les habitations+  * The school gymnasium and other parts of the school are not open to the general public. 
-mobiliser les acteurs, +  * Construction of a new outlet village is due to begin in early 2015bringing increased traffic. ​ 
-impossibilité de délocaliser les entreprises,​ +  * The new housing development cannot be re-sited. 
-site assez réduit.+  * Local businesses cannot be relocated. 
 +  * There is a habitat corridor for wildlife that cannot be built on. 
 +  * The site is relatively small and building potential limited.
  
 ====== Presentation by the French Town Hall  ====== ====== Presentation by the French Town Hall  ======
Line 49: Line 51:
 {{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​800|}} {{:​start:​1-france:​b-redesigning:​presentation_mairie_la_verpilliere_2_-_sept_2014.jpg?​800|}}
  
-{{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​500 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​500|}}+{{:​start:​1-france:​b-redesigning:​aerial_view.jpg?​460 |}}{{ :​start:​1-france:​b-redesigning:​aerial_view_2.jpg?​490|}}
  
  
start/1-france/b-redesigning/architecture.txt · Last modified: 2014/12/29 20:14 by antony